Marvella
MARVELLA “BIG PIPE” — Construction in this 100ft right of way road consisted of 1800LF of 60ft storm drain with relocation of existing water and power facilities in southwest Las Vegas NV.
This author has not written his bio yet.
But we are proud to say that Terra Contracting contributed 56 entries already.
MARVELLA “BIG PIPE” — Construction in this 100ft right of way road consisted of 1800LF of 60ft storm drain with relocation of existing water and power facilities in southwest Las Vegas NV.
WHITE HORSE WEST “MOVE YOUR GAS” — Southwest Gas facility tie-in with double by-pass to lower existing facility before culvert installation. Terra had to maintain gas flow to an existing 150 home housing tract at all times. Terra Contracting’s certified gas installer (seen here) worked hand-in-hand with Southwest Gas crews to complete a successful tie-in.
WHITE HORSE WEST “QUICK CANAL” — Constructed for Lennar Homes in Las Vegas. With only a 1- month approval from Clark County to close the road, the construction schedule was tight and challenges popped up daily.
LAS VEGAS BLVD AND MARION INDUSTRIAL PARK “FILLING IN THE LOW SPOTS” — Terra completed the earthwork portion of the fifteen-acre project requiring 50,000 cubic yards of import to bring the site to grade.
“MAKE SOMETHING OLD NEW AGAIN” — As the general contractor/self-performer on this project Terra removed and replaced over 100,000 sq. ft. of asphalt after installing a new sewer system and valley gutter throughout the project.
RIVERWALK OFF-SITE UTILITY INSTALLATION “WALKING ON WATER” — Terra crossed the Las Vegas wash twice to install new water, twice to install new sewer (force main), and once for the power & telecommunications. All to feed a 300-unit subdivision. Terra is no stranger to ground water mitigation during construction. Terra has constructed 16′ deep sewer and storm drain systems in marsh conditions where ground water was encountered at 2′ depths. All construction utilized de-watering systems to maintain a safe installation environment.