Maryland Parkway Improvement Project for RTC “Keeping the Corridor Connected”

Maryland Parkway Improvement Project for RTC “Keeping the Corridor Connected” — When the Regional Transportation Commission moved forward with the Maryland Parkway Improvement Project to expand transit access, improve pedestrian infrastructure, and upgrade roadway systems, Terra Contracting provided underground utility and communication infrastructure support to help keep the corridor connected throughout construction.

Terra Contracting relocated multiple communication boxes and assisted with numerous power and fiber line installations to support roadway widening, lighting upgrades, sidewalk improvements, and transportation infrastructure enhancements along one of the region’s major traffic corridors.

Nevada’s Largest Developer “Powering Development”

Nevada’s Largest Developer “Powering Development” — When Nevada’s largest developer needed to bring power infrastructure to a new development, Terra Contracting delivered complete underground utility construction solutions to keep the project moving forward. The project required large-scale trenching, conduit installation, manhole placement, and final roadway restoration to support long-term infrastructure expansion.

Terra Contracting trenched more than 2.4 miles, installed 15 manholes, and placed over 7 miles of conduit to support the project’s power infrastructure systems. To complete the work, Terra’s asphalt crew restored more than 181,000 square feet of asphalt, providing full underground utility installation and surface restoration services from start to finish.

Tropicana and I-15 New Bridge “Excalibur Relocation”

Tropicana and I-15 New Bridge “Excalibur Relocation” — As part of the Tropicana and I-15 bridge improvements project, Terra Contracting completed utility relocation work to support ongoing roadway construction and infrastructure upgrades. The project required excavation, conduit installation, fiber relocation, and utility coordination within a high-traffic corridor near the Las Vegas Strip.

Terra Contracting removed existing conduit and fiber, installed more than 434 feet of new conduit and fiber, relocated the west manhole 8 feet, and relocated the east handhole 6 feet to accommodate the new bridge improvements. The work also included excavation around existing utility boxes, creation of a new relocation path, fiber splicing, slurry removal, and final backfill restoration.

Van Wagenen Street Improvements for City of Henderson, NV

Van Wagenen Street Improvements for City of Henderson, “Power Move” — When the City of Henderson moved forward with the Van Wagenen Street Improvements project, Terra Contracting relocated large underground power systems to support roadway and infrastructure upgrades throughout the corridor. The project required careful coordination to maintain progress while safely working around existing underground utilities.

Terra Contracting installed two large underground vaults, placed more than 900 feet of conduit, and relocated multiple transformers to clear the way for the City’s infrastructure improvements. The completed utility upgrades strengthened power infrastructure reliability while supporting long-term roadway and community development in Henderson.

Peace Way & Durango Improvements for Clark County, NV

Peace Way and Durango Improvements for Clark County, NV “Powering the Way” — When Clark County moved forward with the Peace Way and Durango Improvements project, Terra Contracting rerouted existing power systems and installed new conduit to improve infrastructure throughout the corridor. The project included new power systems, power manholes, streetlights, trenching, conduit installation, and asphalt paving improvements designed to enhance roadway safety and long-term utility reliability.

Terra Contracting installed more than 1,450 feet of conduit and completed over 8,000 square feet of asphalt paving while coordinating around existing infrastructure and maintaining safe work zones throughout construction. The completed improvements strengthened utility infrastructure and improved transportation safety for the surrounding community.

Boardwalk at Torrance Ranch Preserve

The boardwalk at Torrance Ranch Preserve is now complete! We are thrilled to be able to provide a full loop where visitors and community members can walk and enjoy the beauty of the preserve. We are so grateful for our generous donors Gary and Lajetta Atwood who supported this project through its completion.

Helical Pier Projects

Helical piers are manufactured steel foundation pins that are driven into the soil to a depth below frost line using hydraulic machinery. They are used in new construction, foundation repair for both residential and commercial properties, boardwalks & walkways: including environmentally friendly above-ground trails, as well as shoring and soil stabilization.

Fort Bliss, Texas for US Army Corps of Engineers

FORT BLISS EL PASO TEXAS FOR UNITED STATES ARMY CORPS OF ENGINEERS (USACE) “ALL LIT UP” — Terra’s installation of 165 lights for a future military tank parking lot was not dim.  The coordination with the slip-form-paving put the lights on the GC’s critical path and Terra never failed to make the schedule.  In addition to the lights, Terra also constructed a 365-rod grounding system; at which time Terra developed an installation procedure that achieved the best grounding result of any contractor at that time.

Marvella

MARVELLA “BIG PIPE” — Construction in this 100ft right of way road consisted of 1800LF of 60ft storm drain with relocation of existing water and power facilities in southwest Las Vegas NV.