BLOG

WHAT WE’RE UP TO

FORT BLISS EL PASO TEXAS FOR USACE

FORT BLISS EL PASO TEXAS FOR USACE “At the water's edge” — Terra installed over 8000ft of storm sewer systems; connecting to existing buildings, systems, and detention basins. This was one of three head-walls constructed by Terra and the flattest of the 3 slopes....

read more

Fort Bliss, TX for US Army Corps of Engineers

FORT BLISS EL PASO TEXAS FOR UNITED STATES ARMY CORPS OF ENGINEERS (USACE) “ALL LIT UP” — Terra’s installation of 165 lights for a future military tank parking lot was not dim.  The coordination with the slip-form-paving put the lights on the GC’s critical path and...

read more