by Terra Contracting | Jun 27, 2018 | Case Studies
state route 160 and buffalo drive for clark county nv “red light / green light” — This 200ft x 200ft Right-of-Way was constructed on a very short schedule, working day and night shifts to keep existing traffic flowing. Terra Contracting not only constructed the signal...
by Terra Contracting | Jun 27, 2018 | Case Studies
SANOSTEE DAY SCHOOL NEW MEXICO FOR BUREAU OF INDIAN AFFAIRS (BIA) “WILD WEST CONSTRUCTION” — A 15-acre school project in the middle of the western New Mexico desert. Our scope included the earthwork, on/off-site utilities, SWPPP, head-walls, cattle guards, and...
by Terra Contracting | Jun 27, 2018 | Case Studies
FORT BLISS EL PASO TEXAS FOR USACE “At the water’s edge” — Terra installed over 8000ft of storm sewer systems; connecting to existing buildings, systems, and detention basins. This was one of three head-walls constructed by Terra and the flattest of the 3...
by Terra Contracting | Jun 27, 2018 | Case Studies
FORT BLISS EL PASO TEXAS FOR UNITED STATES ARMY CORPS OF ENGINEERS (USACE) “ALL LIT UP” — Terra’s installation of 165 lights for a future military tank parking lot was not dim. The coordination with the slip-form-paving put the lights on the GC’s critical path and...
by Terra Contracting | Jun 27, 2018 | Case Studies
MARVELLA “BIG PIPE” — Construction in this 100ft right of way road consisted of 1800LF of 60ft storm drain with relocation of existing water and power facilities in southwest Las Vegas NV....