PROJECTS
The True Cost of Hiring Lowest Bid Contractors
By: Terra Contracting
Discover the cost benefits of microtrenching for fiber projects. Faster installs, less disruption, and lower costs for municipalities and developers. Contact Terra Contracting Today!
Boardwalk at Torrance Ranch Preserve
By: Terra Contracting
STATE ROUTE 160 AND BUFFALO DRIVE FOR CLARK COUNTY NV “RED LIGHT / GREEN LIGHT” — This 200ft x 200ft Right-of-Way was constructed on a very short schedule, working day and...
Helical Pier Projects
By: Terra Contracting
Helical piers are manufactured steel foundation pins that are driven into the soil to a depth below frost line using hydraulic machinery. They are used in new construction, foundation repair...
State Route 160 and Buffalo Drive for Clark County, Nevada
By: Terra Contracting
STATE ROUTE 160 AND BUFFALO DRIVE FOR CLARK COUNTY NV “RED LIGHT / GREEN LIGHT” — This 200ft x 200ft Right-of-Way was constructed on a very short schedule, working day and...
Sanostee Day School, New Mexico For Bureau Of Indian Affairs
By: Terra Contracting
SANOSTEE DAY SCHOOL NEW MEXICO FOR BUREAU OF INDIAN AFFAIRS (BIA) “WILD WEST CONSTRUCTION” — A 15-acre school project in the middle of the western New Mexico desert. Our scope included...
Fort Bliss El Paso, Texas for USACE
By: Terra Contracting
FORT BLISS EL PASO TEXAS FOR USACE “AT THE WATER'S EDGE” — Terra installed over 8000ft of storm sewer systems; connecting to existing buildings, systems, and detention basins. This was one...
Fort Bliss, Texas for US Army Corps of Engineers
By: Terra Contracting
FORT BLISS EL PASO TEXAS FOR UNITED STATES ARMY CORPS OF ENGINEERS (USACE) “ALL LIT UP” — Terra’s installation of 165 lights for a future military tank parking lot was not...
Marvella
By: Terra Contracting
MARVELLA “BIG PIPE” — Construction in this 100ft right of way road consisted of 1800LF of 60ft storm drain with relocation of existing water and power facilities in southwest Las Vegas...
White Horse West – Move Your Gas
By: Terra Contracting
WHITE HORSE WEST “MOVE YOUR GAS” — Southwest Gas facility tie-in with double by-pass to lower existing facility before culvert installation. Terra had to maintain gas flow to an existing 150...
White Horse West
By: Terra Contracting
WHITE HORSE WEST “QUICK CANAL” — Constructed for Lennar Homes in Las Vegas. With only a 1- month approval from Clark County to close the road, the construction schedule was tight...
Las Vegas Boulevard and Marion Industrial Park
By: Terra Contracting
LAS VEGAS BLVD AND MARION INDUSTRIAL PARK "FILLING IN THE LOW SPOTS” — Terra completed the earthwork portion of the fifteen-acre project requiring 50,000 cubic yards of import to bring...
Making Something Old New Again
By: Terra Contracting
"MAKE SOMETHING OLD NEW AGAIN” — As the general contractor/self-performer on this project Terra removed and replaced over 100,000 sq. ft. of asphalt after installing a new sewer system and valley...
Riverwalk Off-Site Utility Installation
By: Terra Contracting
RIVERWALK OFF-SITE UTILITY INSTALLATION “WALKING ON WATER” — Terra crossed the Las Vegas wash twice to install new water, twice to install new sewer (force main), and once for the...