Entries by Terra Contracting

White Horse West – Move Your Gas

WHITE HORSE WEST “MOVE YOUR GAS” — Southwest Gas facility tie-in with double by-pass to lower existing facility before culvert installation. Terra had to maintain gas flow to an existing 150 home housing tract at all times. Terra Contracting’s certified gas installer (seen here) worked hand-in-hand with Southwest Gas crews to complete a successful tie-in.

White Horse West

WHITE HORSE WEST “QUICK CANAL” — Constructed for Lennar Homes in Las Vegas. With only a 1- month approval from Clark County to close the road, the construction schedule was tight and challenges popped up daily.

Making Something Old New Again

“MAKE SOMETHING OLD NEW AGAIN” — As the general contractor/self-performer on this project Terra removed and replaced over 100,000 sq. ft. of asphalt after installing a new sewer system and valley gutter throughout the project.

Riverwalk Off-Site Utility Installation

RIVERWALK OFF-SITE UTILITY INSTALLATION “WALKING ON WATER” — Terra crossed the Las Vegas wash twice to install new water, twice to install new sewer (force main), and once for the power & telecommunications. All to feed a 300-unit subdivision. Terra is no stranger to ground water mitigation during construction. Terra has constructed 16′ deep sewer and storm drain systems in marsh conditions where ground water was encountered at 2′ depths. All construction utilized de-watering systems to maintain a safe installation environment.