Peace Way and Durango Improvements for Clark County, NV “Powering the Way” — When Clark County moved forward with the Peace Way and Durango Improvements project, Terra Contracting rerouted existing power systems and installed new conduit to improve infrastructure throughout the corridor. The project included new power systems, power manholes, streetlights, trenching, conduit installation, and asphalt paving improvements designed to enhance roadway safety and long-term utility reliability.
Terra Contracting installed more than 1,450 feet of conduit and completed over 8,000 square feet of asphalt paving while coordinating around existing infrastructure and maintaining safe work zones throughout construction. The completed improvements strengthened utility infrastructure and improved transportation safety for the surrounding community.
The Peace Way and Durango Improvements project required close coordination between utility crews, paving operations, and roadway infrastructure teams to maintain efficiency and minimize disruption during active construction. Terra Contracting performed trenching, conduit placement, utility adjustments, and surface restoration while meeting strict project timelines and quality standards.
From underground utility work to final paving and streetlight installation, Terra Contracting delivered dependable infrastructure solutions that support long-term community growth and roadway safety throughout Clark County.



