by Terra Contracting | Jun 27, 2018 | Case Studies
WHITE HORSE WEST “Quick Canal” — Constructed for Lennar Homes in Las Vegas. With only a 1- month approval from Clark County to close the road, the construction schedule was tight and challenges popped up...
by Terra Contracting | Jun 27, 2018 | Case Studies
LAS VEGAS BLVD AND MARION INDUSTRIAL PARK “FILLING IN THE LOW SPOTS” — Terra completed the earthwork portion of the fifteen-acre project requiring 50,000 cubic yards of import to bring the site to...
by Terra Contracting | Jun 27, 2018 | Case Studies
“MAKE SOMETHING OLD NEW AGAIN” — As the general contractor/self-performer on this project Terra removed and replaced over 100,000 sq. ft. of asphalt after installing a new sewer system and valley gutter throughout the...
by Terra Contracting | Jun 27, 2018 | Case Studies
Riverwalk Off-Site Utility Installation “Walking on Water” — Terra crossed the Las Vegas wash twice to install new water, twice to install new sewer (force main), and once for the power & telecommunications. All to feed a 300-unit subdivision. Terra is no stranger...