by Terra Contracting | Jun 27, 2018 | Case Studies
WHITE HORSE WEST “MOVE YOUR GAS” — Southwest Gas facility tie-in with double by-pass to lower existing facility before culvert installation. Terra had to maintain gas flow to an existing 150 home housing tract at all times. Terra Contracting’s certified gas installer...
by Terra Contracting | Jun 27, 2018 | Case Studies
WHITE HORSE WEST “Quick Canal” — Constructed for Lennar Homes in Las Vegas. With only a 1- month approval from Clark County to close the road, the construction schedule was tight and challenges popped up...
by Terra Contracting | Jun 27, 2018 | Case Studies
LAS VEGAS BLVD AND MARION INDUSTRIAL PARK “FILLING IN THE LOW SPOTS” — Terra completed the earthwork portion of the fifteen-acre project requiring 50,000 cubic yards of import to bring the site to...
by Terra Contracting | Jun 27, 2018 | Case Studies
“MAKE SOMETHING OLD NEW AGAIN” — As the general contractor/self-performer on this project Terra removed and replaced over 100,000 sq. ft. of asphalt after installing a new sewer system and valley gutter throughout the...
by Terra Contracting | Jun 27, 2018 | Case Studies
Riverwalk Off-Site Utility Installation “Walking on Water” — Terra crossed the Las Vegas wash twice to install new water, twice to install new sewer (force main), and once for the power & telecommunications. All to feed a 300-unit subdivision. Terra is no stranger...